The extension process

From the first conversation
to your finished extension.

You might have plans, or just a few ideas. We’ll talk through what you want to change, then work out the next steps together.

Before we build

A few conversations to get the right work underway.

  1. Start with a conversation

    Tell me what isn’t working at home and what you’d like your extension to do.

  2. Share your plans or ideas

    If you have drawings, we’ll look through them. If you’re at the ideas stage, we can talk through where to start.

  3. Look at the house

    We’ll look at the existing home, access and the practical details that may affect the build.

  4. Work through the details

    I’ll bring practical building input and work through the details with your designer or engineer where needed.

  5. Review the scope and quote

    We’ll go through what’s included, the finishes you have in mind and anything still to be decided.

  6. Agree on the work

    Before we start, we’ll review the agreed scope and building contract, then confirm the arrangements for the job.

From site preparation to handover

See an extension take shape

These Ashbury photos follow the work from site preparation to the finished extension. The details will vary with your home and the agreed work.

  1. Build stage 01

    Site preparation

    Temporary fencing set up at Ashbury.

    Temporary fencing at the front of the Ashbury building site.
  2. Build stage 02

    Demolition and preparing the existing home

    We carefully remove the sections needed for the extension, protect the parts being retained and prepare the connection between the existing home and the new work.

    Excavator removing sections of the existing Ashbury house, with retained brick walls and roof framing visible.
  3. Build stage 03

    Slab preparation and concrete pour

    Formwork and reinforcement are prepared before the concrete is poured and finished for the new slab.

    Steel reinforcement mesh and timber formwork prepared for the Ashbury extension slab.
    Formwork and reinforcement ready for the concrete pour.
    Worker finishing the freshly poured concrete slab at the Ashbury extension.
    The concrete slab being poured and finished.
  4. Build stage 04

    Walls and roof framing

    Brick walls and timber roof framing taking shape.

    Brick walls and exposed timber roof framing at Ashbury.
  5. Build stage 05

    Roof coverings

    The roof is on, with rear openings still unfinished.

    Roof tiles and plasterboard ceiling work at the rear extension, with external door openings still unfinished.
  6. Build stage 06

    Lock-up and plastering

    Windows and external doors close in the extension, while plastering prepares the internal walls and ceilings for finishing.

    Internal plasterboard walls and ceiling at Ashbury, with taped joints and exposed electrical leads.
    Internal walls and ceilings plastered at Ashbury, with finishing work still underway.
  7. Build stage 07

    Fit-out and finishes

    Wet-area waterproofing before tiling, followed by cabinetry, flooring, painting and final fixtures.

    Ashbury kitchen with cabinetry and benchtops installed, while fit-off is still underway.
    Cabinetry and benchtops installed, with fit-off still underway.
  8. Build stage 08

    Walk-through and handover

    We’ll walk through the finished work together, discuss any outstanding items and go through the completion documents that apply.

    View the Ashbury project
    The completed Ashbury rear extension and covered patio.
    The completed Ashbury rear extension.
Talk through your plans

Discuss your project with Tony

Call Tony: 1300 855 032

Have plans already, or just an idea? Tell Tony what you’d like to change and where your home is.

Tell Tony about your project.

* Required fields

Add details (optional)

We use the details you provide to respond to your enquiry. Privacy & analytics.